GEM Compliance

GEM COMPLIANCE STATEMENT

Fundamental GEM Requirements

Implemented

GEM Compliant

State Models

Yes ✓

No

Equipment Processing States

No

No

Host-Initiated S1,F13/F14 Scenario

Yes ✓

Yes ✓

Event Notification

Yes ✓

Yes ✓

On-Line Identification

Yes ✓

Yes ✓

Error Messages

Yes ✓

Yes ✓

Documentation

Yes ✓

No

Control (Operator Initiated)

Yes ✓

No

Additional Capabilities

Implemented

GEM Compliant

Establish Communications

Yes ✓

Yes ✓

Dynamic Event Report Configuration

Yes ✓

No

Variable Data Collection

Yes ✓

Yes ✓

Trace Data Collection

No

No

Status Data Collection

Yes ✓

Yes ✓

Alarm Management

Yes ✓

No

Remote Control

Yes ✓

Yes ✓

Equipment Constants

Yes ✓

No

Process RecipeManagement

No

No

Material Movement

No

No

Equipment Terminal Services

Yes ✓

Yes ✓

Clock

No

No

Limits Monitoring

No

No

Spooling

No

No

Control (Host-Initiated)

Yes ✓

Yes ✓

State Models

  • While the communication and control state models are implemented, especially the control state model needs rework.

Equipment Processing States

  • Not implemented yet.

Documentation

  • The documentation isn’t complete yet.

Control (Operator Initiated)

  • Persistence for the ONLINE LOCAL/REMOTE is not yet implemented.

  • The final UI (or hardware) needs the buttons required by this section.

Dynamic Event Report Configuration

  • Persistence for report definitions, report-to-event links and enable status is not yet implemented.

Trace Data Collection

  • Not implemented yet.

Alarm Management

  • Persistence of en-/disable states and report definitions is not implemented yet.

Remote Control

  • The START and STOP remote commands must be implemented to be GEM compliant. Currently only dummy functions are provided

Equipment Constants

  • Persistence of the equipment constants is not implemented yet.

  • Limiting changing equipment to “safe” states is not yet implemented?

  • Equipment constant changed collection event is not yet implemented.

Process Recipe Management

  • Not implemented yet.

Material Movement

  • Not implemented yet.

Equipment Terminal Services

  • The UI requirements can’t be fulfilled by the library

Clock

  • Not implemented yet.

Limits Monitoring

  • Not implemented yet.

Spooling

  • Not implemented yet.